Blog What is Turnkey Solar Power Plant?
Zonex Energie
ZONEX Blog

What is Turnkey Solar Power Plant?

Everything You Wonder About!

Turnkey solar energy system (SPP) applications are solutions where all processes from project design to installation, commissioning to maintenance are undertaken by a single company. Such projects provide convenience and confidence for customers. Here are some frequently asked questions about turnkey SPP applications:


What is Turnkey SPP?

Turnkey SPP is a type of project where all stages of the solar energy system (design, material supply, installation, commissioning, official permits and maintenance) are carried out by a single company. A ready-made system is presented to the customer as "turnkey".


What are the Advantages of Turnkey SPP?

The management of all processes by a single company saves time and effort for the customer.


  • The correct planning and implementation of the project is guaranteed.
  • Official permits, documents and connection processes are carried out by the company.
  • The performance and efficiency of the system are guaranteed.


What are the Stages of Turnkey SPP Projects?


Site Analysis and Project Design: Analysis of the area where the installation will be made, shading examination and system design.


Material Supply: Supply of equipment such as solar panels, inverters, mounting systems, cabling.


Installation and Assembly: Assembly of panels, electrical connections and installation of the system.


Commissioning and Testing: Making the system operational and performance tests.


Official Permits and Connection: Connection processes with the electricity distribution company and completion of the necessary documents.


Maintenance and Support: Periodic maintenance of the system and technical support.


What is the Cost of Turnkey Solar Power Plant?


The cost varies depending on the size of the system to be installed, the quality of the equipment used, the complexity of the project and the location. It is usually calculated on the basis of the cost per kW kWp.


What Documents Are Required for Turnkey Solar Power Plant?

  • Roof or land use permits.
  • Connection permit from the electricity distribution company.
  • Applications required for unlicensed electricity production.
  • Project approval and commissioning documents.


How Long Does It Take to Complete Turnkey Solar Power Plant Projects?


The duration varies depending on the size and complexity of the project. Small-scale systems can be completed in a few weeks, while large-scale projects can take several months.


What is the Payback Period of Turnkey Solar Power Plant?


The payback period depends on the cost of the system, the amount of electricity produced, and electricity prices. It usually varies between 3-4 years.


What to Consider in Turnkey Solar Power Plant Installation?

  • The company's experience and references.
  • The quality and warranties of the equipment used.
  • Detailed planning and analysis of the project.
  • Correct management of official processes.


How is the Electricity Produced with Turnkey Solar Power Plant Used?


The electricity produced is primarily used for consumption. Excess production can be sold to the grid or stored in batteries.


Which Companies Should Be Preferred for Turnkey Solar Power Plant?


Companies that are known in the sector, have strong references, and use quality equipment should be preferred. In addition, the company's technical support, warranty processes, and financial strength are also important.


Is Energy Independence Possible with Turnkey Solar Power Plant?

Yes, especially when used with battery storage systems, energy independence can be achieved to a large extent.


Are There Government Incentives for Turnkey Solar Power Plants?


There are incentives and supports for unlicensed electricity production in Türkiye. In addition, local governments may also provide incentives in some regions.


How to Choose Roof and Land for Turnkey Solar Power Plant Installation?


The roof or land must receive the best sunlight, be free of shadows and be structurally suitable. A professional company performs these analyses.


How Do Warranty and Maintenance Processes Work for Turnkey Solar Power Plants?


Companies generally offer 2 years of labor, 25-30 years for PV panels, 5+5 for inverters, 10 years for construction, 5 years for cables, and 2 years for OG and AG equipment. In addition, periodic maintenance and technical support services are provided.

Search Topic
Popular Topics
What is Turnkey Solar Power Plant? Everything You Wonder About! Read
Types of Electric Vehicle Charging Stations, Installation and Advantages Read
In Solar Energy Systems What is Routine Maintenance? How is Routine Maintenance Performed? Read
What Should You Pay Attention to When Choosing a Solar Panel? Read