Turnkey solar energy system (SPP) applications are solutions where all processes from project design to installation, commissioning to maintenance are undertaken by a single company. Such projects provide convenience and confidence for customers. Here are some frequently asked questions about turnkey SPP applications:
Turnkey SPP is a type of project where all stages of the solar energy system (design, material supply, installation, commissioning, official permits and maintenance) are carried out by a single company. A ready-made system is presented to the customer as "turnkey".
The management of all processes by a single company saves time and effort for the customer.
The cost varies depending on the size of the system to be installed, the quality of the equipment used, the complexity of the project and the location. It is usually calculated on the basis of the cost per kW kWp.
The duration varies depending on the size and complexity of the project. Small-scale systems can be completed in a few weeks, while large-scale projects can take several months.
The payback period depends on the cost of the system, the amount of electricity produced, and electricity prices. It usually varies between 3-4 years.
The electricity produced is primarily used for consumption. Excess production can be sold to the grid or stored in batteries.
Which Companies Should Be Preferred for Turnkey Solar Power Plant?
Companies that are known in the sector, have strong references, and use quality equipment should be preferred. In addition, the company's technical support, warranty processes, and financial strength are also important.
Yes, especially when used with battery storage systems, energy independence can be achieved to a large extent.
There are incentives and supports for unlicensed electricity production in Türkiye. In addition, local governments may also provide incentives in some regions.
The roof or land must receive the best sunlight, be free of shadows and be structurally suitable. A professional company performs these analyses.
Companies generally offer 2 years of labor, 25-30 years for PV panels, 5+5 for inverters, 10 years for construction, 5 years for cables, and 2 years for OG and AG equipment. In addition, periodic maintenance and technical support services are provided.